• Home
  • News
  • Shop
  • Video
  • Photos
  • FAQ
  • back to NHL.com
  • TV Coverage

The work goes on

Tuesday, 12.27.2011 / 2:38 PM

By Adam Kimelman - NHL.com Deputy Managing Editor / Classic Preparations

Share with your Friends


Classic Preparations
The work goes on
PHILADELPHIA -- Rain fell here at Citizens Bank Park, but outside the stadium, it didn't slow the work being done in building Spectator Plaza.

Citizens Bank Way, the street which runs the length of the stadium from home plate to the back of the left-field seating area, was closed off to traffic and more than a half-dozen tents were put up on the first day of the build-out for the fan fun area.

"It shouldn't affect us too much," NHL Senior Vice President of Events Don Renzulli told NHL.com. "We're expecting about an inch of rain today, but we got a lot of stuff done this morning and then we'll start to move inside and do the things we need to do to stay dry.

"It'll probably hold us up a bit, but a lot of tenting is going up, so once they get one up they'll stay dry as best as they can and then we'll just keep moving. I don't anticipate it'll put us that far behind. We have time built in to catch up."

Among the highlights will be a Molson Hockey House, as well a giant video screen, NHL Network broadcast platform, interactive sponsor tents, food and beverage spots and what Renzulli called, "just a tailgate party."

Spectator Plaza opens at 9 a.m. on Jan. 31, and will be open Jan. 1 and Jan. 2, right up to puck drop between the Flyers and Rangers.

Contact Adam Kimelman at [email protected]. Follow him on Twitter: @NHLAdamK
 
Sponsors, Partners